Moduļu mājas (7M)

 
 
 

Moduļu mājas (7M)


Lejupielādē cenrādi vai skaties cenas zemāk
Cenrādis Latviešu valodā pēc pieprasījuma
 
 TOTAL AREA (m²)  SUBTOTAL (EUR)  VAT (0%)  TOTAL (EUR)  EUR/m²
 18,65  25 094,34  0,00  25 094,34  1 345,54
 
 
1. Wood-frame house design
Construction drawings,
included
2. Foundation row of logs
Beams (70x195mm),
Beams (70x95mm),
Fasteners,
included
3. External walls
Horizontal facade boards (21x120mm) (Spruce), Nails (70mm),
Lathing (45x45mm), Nails (90mm),
Lathing (45x95mm), Nails (90mm), Diffusion membrane,
Timber frame (45x145mm), Screws, Isover SKC-20 (140mm), Heat insulation ISOVER (150mm),
Vapor barrier, Lathing (45x45mm), Nails (90mm), Heat insulation ISOVER (50mm),
included
4. Non-Load-Bearing internal walls
Timber frame (45x95mm), Screws,
Heat insulation (100mm),
included
5. Floor panel
OSB 3 (15mm), Nails (70mm),
Shock-absorber layer, Timber frame (195x45mm), Screws, Sound isolation (200mm), Isover SKC-20 (140mm),
OSB (10mm) , Nails,
included
6. Roof panel
OSB 3 (22mm), Nails (70mm),
Lathing (45x45mm), Nails (70mm), Wind barrier,
Timber frame (45x195), Screws, Heat isolation (200mm), Timber frame (45x95), Joint, Heat isolation (100mm),
Vapor barrier, Lathing(25x50mm), Screws,
Wind boards (18x120mm), Staples,
included
7. Inside finishing
Wall playwood, Screws,
Gypsum plasterboard (12,5mm), Screws,
Danp isolation, Wall tiles, Glue, Floor tiles, Glue,
Floor boards (Ash), Screws,
Ceiling playwood, Screws,
included
8. Elektricity/Plumbing
Power cable 1,5x3mm, Power cable 2,5x3mm, Power cable 4x3mm, Tubes,
Sockets, Switches, Lamps,
Junction box,
Sewer pipes ø50, Sewer pipes ø110,
Water pipes ø18,
Tap (bathroom), Tap (Shower),
Sink (bathroom), Toilet boul, Shower stall,
Boiler,
included
9. WWL PASIVE WINDOWS (Uw=0,8W/m²K)
92mm profile (three glasses),
Outside sill (200mm) PU,
included
10. Doors
68mm External doors (Two glasses), Internal doors,
Glass internal doors,
included
11. Sauna
Lathing (45x45mm), Nails (90mm), Isolation with foil,
Finish boards (Ash), Nails 70mm,
Oven,
Glass doors,
included
12. Terrace panel not included
13. Materials for assembling
Slings,
Mounting material,
included
14. Roofing
Icopal,
included
15. Gutters
Metal,
included
16. Chimney not included
17. Stairs not included
18. Transportation
For workers and materials to the construction site - Latvija,
included
19. Crane for assembling
Crane,
not included
20. Scafolds with mounting not included
21. Accommodation for workers not included
22. Assembling
Wooden carcass assembling,
included